MOBB 2009 Installation
Click below to take a look at some of the pictures from the installation!
Installing MOBB
![](/gifs/mobb_slides1.png)
PVC container being pushed into the ground by the ROV Ventana’s arm.",
![](/gifs/mobb_slides2.png)
Lowering the trawl-resistant housing for power and recording systems onto the seafloor.
![](/gifs/mobb_slides3.png)
ROV Ventana carrying seismic package, ready to go down to the seafloor.
![](/gifs/mobb_slides4.png)
Vacuuming the sediments out of the PVC pipe.
![](/gifs/mobb_slides6.png)
Installing the seismometer package inside the PVC pipe using ROV Ventana.
![](/gifs/mobb_slides6.png)
![](/gifs/mobb_slides7.png)
![](/gifs/mobb_slides8.png)
Filling up the voids with glass beads to isolate the seismometer package from ocean current generated noise.
![](/gifs/mobb_slides9.png)
seismometer package is completely buried in the sea floor.
![](/gifs/mobb_slides10.png)
ROV Ventana Installs the battery and recording system package in the trawl-resistant mount.
![](/gifs/mobb_slides11.png)
Preparing to connect the sea floor current meter to the recording system, using underwater mateable connectors and the ROV Ventana, operated from ship Point Lobos.
![](/gifs/mobb_slides12.png)
A few minutes later…
![](/gifs/mobb_slides13.png)
Successful connection achieved for the current meter!
![](/gifs/mobb_slides14.png)
14 Laying the cable between the seismometer system and the recording/battery package. In front: metal drawer on ROV Ventana containing cable.